Boundary Traverse Plan — Redcliff Parcel 14
Segment: North Ridge Control
- Occupy station CP-04 at first light; check plate bubble
- Record instrument height, temperature and barometric pressure
- Midday: chain the old fence line through to CP-07
- Close the loop on CP-04 before the light drops
Field Practices: Re-observe any leg whose misclosure exceeds the ratio
