Tiderace
Overview
Crew
Jobs
Routing
Harbour operations
Tuesday, week 31 — here is where the crew stands right now.
14
Signed in this morning
3
Flagged by the duty lead
Berth 4 fender inspectionWalk the pontoon, log wear on the outer three fenders.HighQueued
Tide gauge recalibrationReference against the harbour datum before the spring run.CriticalQueued
Slipway lighting swapReplace the two failed heads on the north slip.LowRunning
Dredging permit renewalCollate the silt survey and file with the port authority.MediumReview
Winter mooring planDraft the layout for the 40 seasonal berths.MediumRunning
Fuel bay signageReprint the bilingual hazard panels for the pump.HighReview
Q3 dive surveyBook the contractor and confirm slack-water window.HighClosed
Running 4
Review 2
Closed 2
Queued 4